拟议的 2024 年 9 月服务变更
2024 年 9 月服务变更建议概述
Routes
18th•California – Littleton•Mineral
- Schedule Timing
- Route Adjustment
Change
Resume regular service between 18th•California and Littleton•Mineral (detour to Union Station discontinued). Minor schedule adjustments.
Reason
Completion of Phase 1 of the Downtown Rail Reconstruction Project allows for the return of regular service to downtown. The schedule will also account for ongoing preventative rail inspections and maintenance.
Union Station – RidgeGate Parkway
- Schedule Timing
- Service Increase
Change
Increase service frequency to 30 minutes (from 60 minutes). Minor schedule adjustments.
Reason
The proposed return to 15-minute frequency will not be implemented to better match available workforce resources, with the 30-minute frequency accounting for ongoing preventative rail inspections and maintenance.
18th•California – Florida
- Schedule Timing
- Service Increase
- Route Adjustment
Change
Increase service frequency to 30 minutes (from 60 minutes). Minor schedule adjustments.
Reason
The proposed return to 15 minute frequency will not be implemented to better match available workforce resources, with the 30-minute frequency accounting for ongoing preventative rail inspections and maintenance.
Peoria – Lincoln
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance while aligning with E and H schedules, accounting for ongoing preventative rail inspections and maintenance.
Union Station – JeffCo Gov’t Center•Golden
- Service Increase
Change
Restore 15-minute frequency on weekdays from 6 a.m.–6 p.m.
Reason
In support of the System Optimization Plan
Broadway / South Broadway
- Schedule Timing
- Route Adjustment
Change
Route 0 will be divided into two separate routes: Route 0: Broadway, Route 0B: South Broadway
Reason
In support of the System Optimization Plan
South Broadway Limited
- Service Reduction
Change
Discontinue all-day service, restore peak-only service
Reason
Completion of Phase 1 of Downtown Rail Reconstruction Project (return of downtown rail service on D, H and L lines).
West 1st Avenue
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
Alameda Ave
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
East Alameda Limited
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
East 6th Ave
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
Mississippi Ave
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
North Pecos
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
20th Ave
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
University Blvd
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
South Federal Blvd
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
West 38th Ave
- Schedule Timing
- Route Adjustment
Change
Western terminal moving to new Lutheran Hospital campus in Clear Creek Crossing. Minor changes to schedule.
Reason
Improve on-time performance.
Colorado Blvd
- Service Increase
Change
Provide 15-minute frequency on entire route on weekdays from 6 a.m.–6 p.m.
Reason
In support of the System Optimization Plan
Denver / Commerce City
- Schedule Timing
Change
Adjust departure times
Reason
Improve connectivity to the N Line at Commerce City•72nd Station.
Sheridan Blvd
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
Monaco Parkway
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
Quebec Street
- Seasonal Adjustment
Change
Restore school service
Reason
Align with ridership levels.
Central Park / 72nd Ave Station
- Schedule Timing
Change
Adjust departure times
Reason
Improve connectivity to the N Line at Commerce City•72nd Station.
Thornton / Commerce City
- Schedule Timing
Change
Adjust departure times
Reason
Improve connectivity to the N Line at Commerce City•72nd Station.
N Colorado Blvd Limited
- Schedule Timing
Change
Adjust departure times
Reason
Improve connectivity to the N Line at Thornton Crossroads•104th Station.
Thornton / Brighton Limited
- Schedule Timing
Change
Adjust departure times
Reason
Improve connectivity to Route 120 and the N Line at Eastlake •124th Station.
Table Mesa / Moorhead / North 19th Street
- Seasonal Adjustment
- Route Adjustment
Change
Detour along 19th Street. Restore weekday service frequency.
Reason
Account for Boulder’s 19th Street and Fourmile Canyon Creek Underpass Project while also aligning with ridership levels during fall/winter.
28th Street / Gunbarrel
- Schedule Timing
Change
Adjust northbound departure time from Downtown Boulder Station from 4:07 p.m. to 4:05 p.m.
Reason
Align with ridership levels.
Conestoga / Arapahoe / Fairview High School
- Schedule Timing
Change
Minor changes to schedule
Reason
Align more closely with Boulder Valley School District bell times.
Boulder / Lafayette (via Baseline)
- Seasonal Adjustment
Change
Restore weekday service frequency
Reason
Align with ridership levels during fall/winter.
Boulder / Denver Airport
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
Boulder / Longmont
- Schedule Timing
- Route Adjustment
Change
Coffman/8th stop relocated to Bross/8th. Minor changes to schedule.
Reason
Stop relocated due to construction associated with the CO 119 BRT Project. Changes will also improve on-time performance and account for new Bross/8th stop location.
30th Street
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
Boulder / Lafayette (via Louisville)
- Seasonal Adjustment
Change
Restore weekday service frequency. Minor changes to schedule.
Reason
Align with ridership levels during fall/winter while improving on-time performance.
Free MallRide
- Service Increase
Change
Restore 5-minute frequency
Reason
Completion of Phase 1 of Downtown Rail Reconstruction Project.
Free MetroRide
- Service Reduction
Change
Discontinue service
Reason
Completion of Phase 1 of Downtown Rail Reconstruction Project and return of 5-minute frequency on Free MallRide.
Boulder / Lafayette (via Arapahoe)
- Seasonal Adjustment
Change
Restore weekday service frequency
Reason
Align with ridership levels during fall/winter.
Eldora / Nederland / Boulder
- Seasonal Adjustment
- Route Adjustment
Change
Restore seasonal service to Eldora ski mountain. Minor changes to schedule.
Reason
Align with ridership levels during fall/winter while improving on-time performance.
Parker / Denver
- Schedule Timing
Change
Minor changes to schedule
Reason
Improve on-time performance.
Broadway
- Seasonal Adjustment
Change
Restore weekday service frequency
Reason
Align with ridership levels during fall/winter.
公听会和反馈会
RTD 正在举办面对面和虚拟的公开会议,以传达拟议的变更、回答问题并收集客户、利益相关者和社区的反馈意见。
- 6 月 18 日星期二中午
虚拟会议
立即参加会议
会议编号: 223 758 414 776
密码Pn7MaH
电话拨号 +1 720-443-6193,,473332783#美国丹佛
查找本地电话号码 - 6 月 18 日星期二下午 6:00
拉阿尔玛娱乐中心
丹佛西 11 大道 1325 号 - 虚拟办公时间
请在下午 5:30 至 7:00 之间参加活动,就拟议的九月份服务变更提出问题和反馈意见。请注意,本次活动将不作正式介绍。
6 月 24 日星期一
下午 5:30-7:00
提前注册参加本次会议 - 6 月 20 日星期四下午 5:30
布莱克行政大楼,T 室和 D 室
丹佛布莱克街 1660 号 - 6 月 22 日星期六下午 1:00
卡拉-麦迪逊娱乐中心
丹佛科尔法克斯大道东 2401 号 - 6 月 25 日星期二下午 5:30
恩格尔伍德公共图书馆,安德森厅
1000 英格伍德公园路
除上述公众会议外,RTD 还会在参加社区活动时回答有关服务变更建议的问题。RTD 社区活动的完整日程表如下 在线提供.
如果您在 RTD 举办的活动(如董事会会议、开放日或其他社区参与活动)中需要口译员,请发送电子邮件至 RTD 的公共交通公平专家和语言无障碍协调员,电子邮件地址为 [email protected] 或致电 303.299.2051.请注明活动名称和日期以及所需语言。请至少在活动开始前 5 个工作日提交申请,以确保我们能找到口译人员。
提供反馈
RTD 正在收集客户、利益相关者和社区对 2024 年 9 月服务变更的反馈意见,截止日期为 2024 年 6 月 28 日(星期五)。所有反馈意见将在七月份的会议周期内与 RTD 董事会共享。
您可以通过五种方式对拟议的服务变更提出反馈意见。
- 发送电子邮件
[email protected] - 致电客户服务中心
303.299.6000 - 在 RTD 的公开会议上发表意见(见上文),或在 RTD 网站上发表意见(见上文)。 董事会会议
- 参观 RTD 工作人员在当地 社区活动
- 完成在线反馈调查 (关于 2024 年 9 月服务变更建议的调查已于 6 月 28 日星期五结束)。
需要将 RTD 资料翻译成西班牙语以外的特定语言?RTD 将尽可能提供您所需的翻译! 点击此处.
了解有关九月份服务变更建议的更多信息